Der Baustopp – Die Leere, Gustave-Eiffel-Schule, Berlin

Installation in collaboration with Paul Zoller – wallboards (gypsum), silicone, silicone strings,
speaker cable, 18 loudspeakers, 5 stereo sound tracks, video projection

 

 

 

 

 

 

 

©Stefan Rummel, Berlin, 2017